List of Glory – Updated 4.0

Here’s where we stand as of today with the final checklist:

  • Touch up painting (Sean finished yesterday)
  • Tape Trim
  • Caulk Trim
  • Paint Trim 
  • Paint Interior Doors
  • Paint Exterior Doors
  • Install Hardwood Floors – 90% done so I’m checking it off.  I’m a rebel like that.
  • Holes drilled in countertops and have countertops sealed
  • Light fixtures installed
  • Finish Grouting
  • Plumbing fixtures installed – In progress
  • Stair Railings and treads installed & painted
  • Baseboards in wood floor rooms installed & painted
  • Appliances installed 
  • Carpets installed (still need to pick out carpet as well)
  • Finish fencing on sideyard
  • Fencing along back retaining wall
  • Landscaping front yard
  • Pea gravel down on sideyards
  • Seed backyard grass
  • Build barn doors & tracks – After move in
  • Build out the closets – After move in
  • Stain front porch and back deck – Possibly after move in
  • Have glass installed in master bath

At this point, we are hoping to have all inside the house stuff finished by the end of the month and then take the first week or two of March to landscape to whatever minimum the City will let us get away with.  Hoping to move in by the middle of the month!

20140219-110201.jpg

20140219-110151.jpg

20140219-110231.jpg

20140219-110243.jpg

20140219-110213.jpg

20140219-110222.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s